Allegany College of Maryland Child Care Center Renovation Notice to Bidders Request for Proposals Allegany College of Maryland is seeking competitive proposals from qualified, reliable Contractors to install new offices in the Child Care area located in the lower section of the College Center. The successful vendor will be responsible for providing all building material, and include all ceiling tile/grid re-work, interior door/frame reuse, HVAC diffuser relocation, painting, electrical, and flooring work required for a complete project. The Contractor is to furnish labor, materials and equipment required to completely construct each office indicated on the drawing. Drawings can be obtained from Adam Phipps, Director of Physical Plant, Allegany College of Maryland @ 301-784-5262. Please visit our webpage www.allegany.edu/rfp for complete specifications. Sealed proposals (in duplicate) with the words Child Care Center Renovation on the front of the envelope must be received by December 1, 2014 @12:00 noon in the office of: Mrs. Sherry Buffenmyer Director of Fiscal Affairs Allegany College of Maryland 12401 Willowbrook Road College Center Room 177 Cumberland, MD 21502-2596 Award of the bid will be at a later date after an analysis of all proposals. Allegany College of Maryland reserves the right to reject any or all proposals and request other proposals. Allegany College of Maryland reserves the right to accept any proposal it feels is in the best interest of the College. Times 11/16, 20, & 23
↧